ArabicArabicFrenchFrenchSpanishSpanishRussianRussianGermanGermanItalianItalianJapaneseJapaneseKoreanKoreanPortuguesePortugueseHindiHindiRomanianRomanianPolishPolishThaiThaiEnglishEnglish
English | Chinese |

Facebook
Twitter
Youtube
LinkedIn
Pinterest

Tianjin BoYuan Machinery Equipment Co

qiuye.1104@163.com

  • Home
  • About us
  • Products
    • whole production line
    • Treatment and Cleaning units
      • WATER TREATMENT PLANTS
      • OUTSIDE WASHING MACHINE
      • 5 GALLON INNER SIDE WASHING MACHINE
      • HIGH PRESSURE 5 GALLON WASHING MACHINE
    • Filling Machines
      • BY-XGF-450, Automatic Filling Machine
      • BY-XGF-600, Automatic Filling Machine
    • Capping & Labeling Machine
      • LABELER AND DELABELER MACHINE
      • CAPPER& DE-CAPPER MACHINE
    • Smart Warehousing
      • PALLETIZER
      • BAGGING MACHINE
    • Product Line Accessories
  • Services
  • R&D
  • News
    • Company news
    • Industry-news
  • Contact us
  • Download
  • Blog

Blog

  1. Home
  2. Blog
  3. How to set up a bottled water plant?...

How to set up a bottled water plant?

A, Water source

First of all, we should choose a good water source. A very important indicator in raw water is electrical conductivity. If the conductivity is too high, it is recommended to choose double stage water treatment equipment. The standard of China's national pure water is that the conductivity is less than 10. The source can be municipal tap water, or if it is groundwater, there is no source of pollution around the water point. Water source: pure water - tap water, mountain springs - from specific protected mountain areas; mineral water - groundwater (well water).

B, Plant

1. The distance between the plant and the water source should be close.

2, Consider there is no pollution source near the plant, the air is fresh, should also consider the external drainage channel is smooth or not.

3, The size of the plant should be based on market demand, equipment production capacity and capital limits.

4, Factory requirements: the minimum is about 300 square meters, divided into production filling workshop, finished product workshop, empty bucket storage workshop, pre-washing tank room, packaging room, laboratory, locker room and so on.

5. The floor and wall of the workshop shall be paved with floor tiles and wall tiles, and the laying of pipes, water supply, drainage and power supply shall be reserved. At the same time, the power supply shall be 380V.

C, Equipment,

1, Water treatment equipment: RO reverse osmosis single or double stage;

2, Pre-cleaning equipment: Decapper equipment, internal washing equipment, external washing equipment

3, Filling equipment: Disinfection equipment, automatic filling equipment

4, Packaging equipment: Labeling equipment, thermoplastic equipment, laser coding machine, bagging machine

5, Warehouse storage Equipment: Palletizer Equipment, storage conveyor

6, Air purification equipment: air purifier and air shower;

7, Disinfection and sterilization equipment: ultraviolet sterilization or ozone sterilization;

8. SC certification.

Factory building, equipment admission, at the same time also need to prepare the required information for the certificate, all the information is complete and through the audit, to obtain the production license to the Industrial and commercial bureau for business license and tax license, can be formally organized production.

For a new bottled water plant, a reasonable production scheme can guarantee water quality and quantity effectively.

Related News

Domestic, non-sparkling water is the largest and strongest segment of the U.S. bottled water market.

Domestic, non-sparkling water is the largest and strongest s

How to Choose a 5-Gallon Bottle Washing and Filling Machine: A Buyer’s Guide

How to Choose a 5-Gallon Bottle Washing and Filling Machine:

Where does bottled water come from?

Where does bottled water come from?

How to improve the efficiency of water plant cap pulling?

How to improve the efficiency of water plant cap pulling?

How to improve the efficiency of bagging 5 gallon water bottle?

How to improve the efficiency of bagging 5 gallon water bott

5 gallon bottle line automatic pretreatment 2000bph plant

5 gallon bottle line automatic pretreatment 2000bph plant

Product Categories

  • whole production line
  • Treatment and Cleaning units
    • WATER TREATMENT PLANTS
    • OUTSIDE WASHING MACHINE
    • 5 GALLON INNER SIDE WASHING MACHINE
    • HIGH PRESSURE 5 GALLON WASHING MACHINE
  • Filling Machines
    • BY-XGF-450, Automatic Filling Machine
    • BY-XGF-600, Automatic Filling Machine
  • Capping & Labeling Machine
    • CAPPER& DE-CAPPER MACHINE
    • LABELER AND DELABELER MACHINE
  • Smart Warehousing
    • PALLETIZER
    • BAGGING MACHINE
  • Product Line Accessories

Links

Google.comBaidu.com

BY equipment

LatestPost

  • Commissioning 2000bph production line for Inner Mongolia Customer
    Commissioning 2000bph production line fo
    2022-04-24
  •  Automatic 5 Gallon Bottle Water Filling Machine sent to Client
    Automatic 5 Gallon Bottle Water Filling
    2022-01-16
  • Our machine arrived to its destination
    Our machine arrived to its destination
    2022-01-18

Feedback

Contact Us

+8618622019769

+86 18622019769

qiuye.1104@163.com

Jizhou Science and Technology Industrial Park, Tianjin, China

Whatsapp Business

Copyright © 2016~2026 Tianjin BoYuan Machinery Equipment Co,. LTD All Rights Reserved.

  • Skype.
  • E-mail
  • Whatsapp
  • Inquiry